All Permits are based on the cost of the job. There is a $40 base fee. Download the full pricing table (PDF).
State Surcharge
- 2.5% or $4 (whichever is greater on all permits)
Impact Fees for New Construction
Inside the City Limits
Residential
- Water: Refer to Resolution Number 14-09-07 ($4,550)
- Construction Water: Refer to Resolution Number 17-09-01 ($292)
- Meter Price: Currently $1,000.00
- Stormwater: Refer to Resolution Number 12-09-08 ($269.57)
- Fire Impact Fee: (Commercial and Residential) Number 06-04-02 ($200)
- Sewer: Refer to ordinance Number 14-09-06 ($2,830)
Multi Family
- Water, Sewer and Meter required for each dwelling
Outside the City Limits
Residential
- Water: Refer to Resolution Number 14-09-07
- Construction Water: Refer to Resolution Number 17-09-01 ($292)
- Meter: Current Price of all materials required to supply water
Commercial
All Construction
All new construction requires an 11 by 17 set of plans, or a digital set.